Project Coordinated by Bobby MatisonProtect Your Lightwell and Prevent Future Water Damage with a Premium PVC Waterproofing System
Installed a premium 80-mil dark brown PVC roofing system at the bathroom and bedroom lightwell areas to provide long-term waterproof protection and prepare the space for future deck installation. The project included a sacrificial PVC layer for a floating deck system, plumbing integration for secure drain sealing, siding replacement and painting, and detailed waterproofing at all critical transitions.
Additional work included coordination prep for future sliding door installation and potential plywood deck replacement as needed to ensure long-term structural durability and performance.
Result: a fully waterproofed, future-ready lightwell system designed to prevent leaks, improve drainage, and support upcoming outdoor living upgrades with confidence.
Don’t wait for hidden water damage to become a costly repair—schedule your waterproofing evaluation today and protect your investment for years to come.